LIVE · DUNEDIVE · GLOBAL OPS
SIGNAL ▓▓▓░░░00:00:00 ONLINE
DEPTH / DEPLOY
012 m
LAT 44.80° N / LON 106.96° W · NODE SHERIDANDUNEDIVE · 07 SIGNALSDIST 0.0 KM | DEPTH 012 M
DuneDive
FIELD OPS2026-07-02

ROV crew mobilized to a flooded municipal interceptor within 22 hours

A blocked, partially flooded interceptor was cleared, inspected and documented end to end: partner crew, DuneDive methods and live software on site in under a day.

A municipal operator called with an interceptor that was blocked, partially flooded and impossible to inspect with local equipment. Within 22 hours a regional partner crew was on site, equipped with our dive sondes, a tracked crawler and the live SondeScan console, working to our concept.

The line was cleared and inspected in a single deployment. Because coding happens live on site, the operator received a structured, standard-compliant condition report before the crew left. No waiting weeks for a PDF.

This is the model for every DuneDive engagement: one call, one concept, one directed partner deployment, one documented result.

All updates